Artist, Cosplayer, Writer.
University of Washington

Varied 3-D work in both fine and theatrical arts, for university and personal purposes.

2-D sketchbook work, digital art, and varied paintings.

I have been fortunate enough to participate in set dressing work for HBO's Westworld and Amazon's Fallout, as well as serve as the Prop Master for Seattle Pacific University's Anastasia.

A small collection of personal graphic design I have done, as well as brand work for various non-profits and businesses.


"Holden," Ballpoint Pen, 2026.

Marble Hornets Paint Studies, 2025.

Cafe Sketches, 2025.

"Twins," 2025.

"There is Something in the trees." 2025.

Figure Studies. 2024.

"Cryptid Kid and Solar Flare." 2024.

"BlueJay," 2024. Acrylic on Bristol.

Hadestown. 2024.

“Four Films about Personhood (Or: The understanding that style is built on strong foundations).” Acrylic. 2024.

EMH. 2024.

New Years Self Portrait. 2024.

Red Dead Redemption 2. 2024.

Project Planning and Character Sketch. 2024.

Fictional Brace Design and Anatomy Studies. 2024.

Studies from Discovery Park, Seattle. 2024.

Aragorn and LOTR Studies. 2023.
From September 2024 to February 2025, I served as the Prop Master for Seattle Pacific University's production of Anastasia: The Musical. I sourced and crafted over 65 props for the show and worked with the cast and crew throughout the process of this show.
Directed by Candace Vance, Designed by Tucker Goodman.
Production photos by Michelle Smith-Lewis photography.

Actors: Daniel Mercado, Lizzy Butler, Jack D'Agostino; Props: Leather Satchel, Cans, Music Box, Marketeer Merchandise Blanket

Actors: Daniel Mercado, Josephine Partridge, Jack D'Agostino; Props: Bentwood Chairs, Food Platter, Table

Actors: Dutch VanOmmen; Props: Desk (Designed by Tucker Goodman and built by the Production Practicum team), Desk Dressing, Telephone

Actors: Daniel Mercado, Josephine Partridge, Daynnie Hansen, Tony Le; Props: Leather Satchel, Fire Barrel, Music Box

Actors: Carson Wong, Ensemble; Props: Leather Satchel, Suitcases, Carpet Bag, Train Benches.

Actors: Jack D'Agostino, Daniel Mercado, Josephine Partridge, Ensemble; Props: Leather Satchel, Suitcases, Carpet Bag, Train Benches, Wanted Poster

Actors: Jack D'Agostino, Daniel Mercado, Josephine Partridge, Ensemble; Props: Prop Cigarette, Blanket, Book, Picnic Basket, Easel, Plein Air Painting

Actors: Ensemble; Props: Bistro and High Tables, Champagne Buckets, Champagne Bottles, Coupe Glasses

Actors: Daniel Mercado, Josephine Partridge; Props: Bentwood Chairs (Courtesy of Taproot Theatre Company), Upholstered Cushions

Actors: Olivia Widmer, Josephine Partridge; Props: Hotel Chair, Carpet Bag, Music Box, Loveseat

Actors: Gabriela Tolomei, Jack D'Agostino, Ensemble; Props: Legal File, Lectern, Notepads

Actors: Josephine Partridge, Dutch VanOmmen; Props: Gun, Carpet

Actors: Daniel Mercado; Props: Leather Satchel, Fire Barrel with interior lighting.

BTS: Fire Barrel

BTS: Upholstered Cushions

BTS: Wanted Poster

BTS: Marketeer Merchandise Blanket

Design Presentation Slide 1/3: Assembling Props

Design Presentation Slide 2/3: Research and Props

Design Presentation Slide 3/3: Hand Props
In 2022, I was asked to create ten drawings for HBO's Westworld season four (varied featured below). Following this, in 2023, I created a portrait for HBO's Fallout.
I am an avid cosplayer just returning to the form after a five-year hiatus, with my most recent build being Mollymauk Tealeaf from Critical Role. The coat alone is over seven hundred hours of hand embroidery and patterning. I am looking forward to my future in the con circuit, with Vax'ildan as a future cosplan.I am also a quilter and sculptor.

Mollymauk Tealeaf cosplay, 2026. Character by Taliesin Jaffe from Critical Role. Photo by JarNinetyNine.

Mollymauk Tealeaf cosplay, 2026. Character by Taliesin Jaffe from Critical Role.

Mollymauk Tealeaf cosplay, 2026. Character by Taliesin Jaffe from Critical Role.

"When My Wandering Meanderings Have Finally Reached Their End," 2025. Quilt. 6' x 7'.

"When My Wandering Meanderings Have Finally Reached Their End," 2025. Quilt. 6' x 7'. Gallery View.

"When My Wandering Meanderings Have Finally Reached Their End," 2025. Quilt. 6' x 7'.

"When My Wandering Meanderings Have Finally Reached Their End," 2025. Quilt. 6' x 7'.

"Home Comforts I," 2025. Crocheted VHS tape, varied dimension.

"My Brother's Keeper" 2/3. Mask and digital photography. 2024.

"My Brother's Keeper" 1/3. Mask and digital photography. 2024.

"My Brother's Keeper" 3/3. Mask and digital photography. 2024.

"My Brother's Keeper" Display. 2024.

Bedroom Model, 2024. Various. 1' x 1' x 1'.

"Llewyn." Wire, clay, fabric sculpture. 2024.

"Long Distance Movie Night." Fabric, cardboard, digital photography. 2024.

"Long Distance Movie Night." Digital Photography. 2024.
I am a very passionate fan of various types of media, and enjoy doing hypothetical graphic design for them. Three examples here are for the 2025 "Rock Stars on Ice" United States Tour, Critical Role's "The Mighty Nein" Animated Series, and The West End production of "Hadestown."
Cover photography and artwork belongs to the original IPs. All graphic compiling and DVD design done by me.I have also worked with various companies for the past four years to improve their social media presence and brand recognition. Examples featured below from ROSIESjobs in Culver City, California; The Loft in Westwood, California; and The Bread and Roses Theatre in Lambeth, London.

Banner for the Lambeth Fringe 2024

Interior Sample for the Lambeth Fringe 2024 Brochure

Brochure Cover for The Lambeth Fringe 2024

Instagram Post Blank V1 for The Loft. 2022.

Instagram Post Blank V2 for The Loft. 2022.

"Content Plan" Opening page for The Loft. 2022.

"Style Guide" for The Loft. 2022.

"Content Plan" for ROSIESjobs. 2022.